When wire rope clips are added to a lashed load, the rated load falls.

Adding wire rope clips to a lashed load lowers the system's rated load. Friction, local deformation, and stress concentration at the clip grip reduce the rope's strength. Proper spacing and installation help, but the clips still decrease the overall load-carrying capacity compared with unclipped rope.

Clip trouble and the rated load: what really happens when you lash a load

Let’s chat about a detail that often slips under the radar on deck or in the rigging shed: what happens to the rated load when you slap wire rope clips onto a lashed (tied) load. If you’ve seen NAVFAC P-307 materials, you’ve probably come across the idea that the clip set changes the game. Here’s the bottom line, plain and simple: the rated load is reduced.

Why that rating drops isn’t a mystery once you pause to think about the physics and the hardware involved. Wire rope isn’t just a smooth, uniform cable—it's a bundle of strands bound tightly together. When you add clips to grip the rope and form a lash, you’re introducing two big forces at once: friction and a point of stress concentration.

Let me explain in a way that sticks. The clip’s saddle and U-bolt press against the rope at the contact points. Where the metal pin bites in, the rope’s fibers experience concentrated pressure. Over time, and under load, those contact spots can deform slightly. That localized deformation doesn’t just stay local; it tends to weaken the rope’s carry capacity at that spot. It’s a bit like bending a straw back and forth—the area near the bend gets weaker before the rest of the straw.

Then there’s friction. As the rope moves or settles under load, the clip creates resistance. That friction isn’t free power—it’s a drag on the rope’s ability to share the load evenly along its length. In a perfect world, the rope would take on the load smoothly from end to end, but the clips interrupt that flow. The result is a reduced effective load-carrying area and a lower reliable capacity for the system as a whole.

This concept isn’t just theoretical. In the field, you’ll hear it summarized as: clips reduce the system’s rated load because they introduce friction and stress points that the rope alone wouldn’t have. It sounds intuitive, but it’s worth repeating because it changes how you approach rigging tasks. If the aim is to haul or secure something heavy with a lashed rope, you’ve got to treat the system as a whole—with the clips factored in—rather than as though the rope were carrying “its” full rating.

Common-sense signals you’ll notice in practice

  • Local indentation or flattening: When you inspect the rigging after the load is applied (or after the system has settled), you might see small indentations where the clip bites the rope. This isn’t just cosmetic; it’s a sign of the weakened region we’re talking about.

  • Uneven load distribution: If the lash isn’t perfectly balanced, some parts of the rope see more tension than others. Clips can magnify that unevenness, concentrating stress in certain segments.

  • Installation matters more than you might guess: A poorly placed clip, too many or too few clips, or clips not spaced properly can hike the risk of a reduced rating even further. In other words, the hardware choices and how you put them in place matter as much as the rope itself.

What this means for real-world work

If you’ve got a lashed load you intend to move or secure, and you’re using wire rope clips, treat the system’s capacity as a chain—not a single link. The rope’s nominal rating is a gauge for rope-only scenarios. Add clips, and you’ve introduced vulnerabilities that can trim that gauge down. The practical takeaway: don’t assume you’re carrying the rope’s full rated load once clips are part of the setup.

A few practical angles to keep in mind

  • Follow the guideline set by the hardware and NAVFAC P-307 references for clip installation. This isn’t a place to improvise; a well-installed set reduces the risk of accidental loss or sudden slack while under load.

  • Don’t rely on a single clip. If the lash requires multiple clips, verify the spacing and alignment so that the load path remains as uniform as possible. Improper spacing can intensify stress concentration at a point where the rope is already challenged.

  • Inspect before and after. A quick visual check for deformation, rust, or misalignment pays off. If you see any of these signs, rework the lash before moving the load again.

  • Consider the dynamic reality. Lifts, shifts, and stops introduce shock loads. Those transient spikes can magnify the effects of clips, sometimes more than you’d expect. Plan for these moments and, if possible, reduce peak loads or use equipment sized for the dynamic condition.

Common mistakes that quietly erode capacity

  • Installing clips without verifying the correct orientation and spacing. It’s not just a pat on the back for “it seems right.” The live portion versus dead end orientation matters, and so does how closely you space the clips.

  • Using worn or damaged rope in a clipped lash. If the rope has any frayed strands, pitting, or corrosion, the clips aren’t redistributing load as cleanly.

  • Relying on the clip’s grip without re-torquing after the initial load settles. A lash isn’t static—the rope shifts as you move, and the clip tension can change. A quick re-check can save you from over-relying on a compromised setup.

  • Overloading the clipped system because you assumed the rope’s rating applies in full. It’s a safe assumption to re-calculate the system rating with the clips included.

A few takeaways to keep handy

  • The safe default is to assume a reduced rated load when clips are part of a lashed setup. That doesn’t mean panic; it means prudent planning. If you’re working near the limits, you’ll want to either reduce the load or add redundancy elsewhere in the rigging.

  • Use the right hardware for the job. Clips come in different sizes and materials; choose ones that match the rope diameter and the environment. Naval standards like NAVFAC P-307 are there to keep you aligned with proven practices.

  • Keep it simple when you can. If a lash looks overly complex or feels uncertain under load, step back and reconfigure with an approach that offers clearer even-load distribution and fewer weak points.

A quick mental model you can carry into the field

Imagine the rope as a water hose. The clips are like clamps that pinch the hose at several points. The water (the load) can still push through, but those pinch points slow it down, create pressure spots, and can even cause a kink if you’re not careful. The more clips you add, the more pinch points you introduce, and the more the system’s overall throughput (the effective rated load) gets tugged down from the rope’s naked capacity. That’s why the rating you rely on shifts the moment clips enter the equation.

Pulling it all together

In NAVFAC P-307 terms—and in the messy, real-world world of rigging—the presence of wire rope clips on a lashed load lowers the system’s rated load. This isn’t a publicity slogan; it’s a result of friction, stress concentration, and potential local deformation at the clip-rope interfaces. The practical upshot is clear: plan for a reduced capacity, install correctly, inspect diligently, and re-check as the load settles. By keeping these habits, you’ll move safely and keep the load secure, even when the math of “clips plus rope” looks less glamorous than a clean, clip-free setup.

If you want to go a step further, you can keep a small pocket guide in your toolkit that lists key checks: clip orientation, rope diameter compatibility, minimum clip count for the lash, spacing guidelines, and a reminder to inspect after the first lift and again after the load settles. A little prep goes a long way, especially when you’re dealing with heavy, dynamic loads on a busy deck.

A closing thought

Rigging isn’t just science; it’s a craft that blends careful calculation with hands-on judgment. The moment you add clips to a lashed load, you’re balancing strength with vulnerability. Recognize that shift, respect the reduced rating, and you’ll find you can move, secure, and lift with confidence—knowing you’ve done your due diligence to keep people and cargo safe.

Glossary quick-ish

  • Rated load: a published capacity for a rope or rigging component under specified conditions.

  • Wire rope clip: a device used to secure the ends of wire rope, forming a lash or loop.

  • Stress concentration: a location where stress is higher due to geometry or material changes, like where a clip bites into rope.

  • Live end vs. dead end: terms used to describe the parts of rope in a setup; the live part carries load and is treated with care during installation.

If you’re working through NAVFAC P-307 materials, you’ll notice the same thread: the hardware matters, the setup matters, and the safety margin you build in by acknowledging a reduced rating when clips are used can be the difference between a smooth operation and a dangerous misstep. Stay curious, stay cautious, and keep the rigging tight, inside the lines that the professionals trust.